Skip to Content

Lane ESD Facilities Projects

Contact: Brad Johnston, Facilities Manager | bjohnston@lesd.k12.or.us | 541-461-8260

Current Projects

Name Description Status

Westmoreland Campus Seismic Rehabilitation

Lane Education Service District, Eugene, Oregon will receive sealed bids for the Westmoreland Campus Seismic Rehabilitation, in writing from contractors until 2:00 PM, Pacific Time, Friday, May 7th, 2021, for materials/services described within the Drawings and Specification prepared by WRK Engineers & BBL Architects.

All interested parties are entitled to attend the bid opening held at the Lane Education Service District Administration Office at 1200 Highway 99, Eugene Oregon 97402 at 2:00 PM, Pacific Time, Friday May 7th, 2021. 

Open

UPDATED: Bidding Closes May 18th, 2021 @ 2:00 PM PST

Mandatory Pre-Bid Meeting – April 14th, 2021 @ 2:00 PM PST

Location: 1717 City View St, Eugene, Oregon 97402

Westmoreland HVAC Upgrades

Lane ESD is seeking a qualified contractor to furnish and install (9) roof top units and install new DDC controls at our Westmoreland Campus in Eugene, Oregon. The full scope of this project can be found in Attachments A through G. Design and engineering has been provided by R&W Engineering.

Closed

Architect & Engineering Services for SRGP - Phase 1 Westmoreland

Lane Education Service District (the "District") is seeking proposals from firms for the architectural, structural, mechanical and electrical design for the Seismic Rehabilitation of Westmoreland (the "Project"), located at 1717 City View Street, Eugene, Oregon 97402. In January 2020, the District applied for and received a Seismic Rehabilitation Grant ("SRG") for the project through the Infrastructure Finance Authority: Business Oregon, based on the application prepared by ZCS Engineering & Architecture. The intent of this RFP is for the consultant to provide an integrated design solution for the entire building. As part of this grant, a preliminary rehabilitation feasibility report was prepared for each portion of the project and is enclosed. The District was awarded $2,378,365 for the design and construction of Westmoreland Phase 1 Seismic Rehabilitation.

Closed as of November 20, 2020

Equity Commitment Leadership Collaboration Integrity